South West Lands

South West Lands

Client:  Quintain
Type of Works:  Enabling works, earthwork support and bearing pile package
Start:  May 2016
Read full case study here

Enabling works by the O’Keefe Group were completed on a residential-led, mixed-use scheme at the heart of the £2.5 billion regeneration of Wembley Park.

 

The O’Keefe Group were busy with site clearance work at Battersea when developer Quintain, who own most of the 85 acres around Wembley Stadium, engaged the group’s construction division for Phase 1 of the South West Lands project.

This comprised enabling works, earthwork support and bearing piles for four tower blocks of up to 20 storeys over a single-storey retail level, basement car park and courtyard space. The piling package also included a contiguous piled retaining wall around the perimeter of the site, south of the iconic stadium.

Work began in May 2016 and Phase 1 was handed over on schedule just before Christmas 2016. Phase 2, for pile caps, drainage and basement slabs has now been completed.

Read full case study here